Modular kitchen timeline in Mumbai: from measure to handover

White Shaker kitchen design inspiration

After design approval and the advance, a modular kitchen with Mumbai Master Carpentry is often about 12–18 days, depending on size and finish. That clock does not start on the first phone call. Before it: a free site visit (we aim for within 48 hours on working days), a measure, an itemised quote, and material sign-off. You get confirmed dates before work starts. A full-flat carpentry sequence is weeks, not this range.

Design inspiration

This page is the kitchen version of how we work. Layouts are on modular kitchens in Mumbai. What moves the price is the kitchen cost guide. What to check before you sign is the quote checklist. The indicative kitchen start remains ₹85,000 for a roughly 10 ft straight run. Timeline and price are both written after the measure.

The phases

PhaseWhat actually happens
1. EnquiryCall, WhatsApp, or the form. Photos help us prepare. They are not a measure.
2. Site visitFree. We aim to visit within 48 hours on working days. The slot is confirmed when we book it. Access, plumbing, beams, and what stays or goes.
3. MeasureRun length, sink, hob, fridge, chimney, pipe positions, and walls that are out of plumb. Cut-outs are planned here.
4. Design and quoteItemised scope, a written timeline, and payment — before any cutting. On most home jobs: 40% advance, 40% when the work reaches site, 20% at handover.
5. Material selectionCarcass grade, shutter finish, and hardware, agreed against the room. Decide these before we cut.
6. FabricationCarcasses and shutters made at 208, Wakefield House, Ballard Pier, Fort. This is most of the 12–18 days.
7. InstallBooked around the society lift and loading window. Fit, level, pack, then a snag walk.
8. HandoverAgainst the quote. 1-year workmanship on the carpentry we built. Hardware follows the maker’s terms where those apply.

What the 12–18 days include

They are the usual range after design approval and advance, for a kitchen whose finish and size are already agreed. A straight laminate run is often the shorter end. Acrylic or PU, tall pantry units, and a workshop queue push toward the longer end. You do not get a slogan. You get the dates for your flat, written on the quote.

One wardrobe in the same home is often about 7–10 days after its own approval, depending on finish and the queue. If the kitchen and wardrobes are one renovation sequence, read home renovation carpentry and the carpentry cost of a flat renovation. That job is weeks.

What stretches the calendar

Electrical, plumbing, civil work, and painting stay with those trades unless a line on the quote says otherwise. We are carpenters. Carcass grade for the wet zone should be chosen at material sign-off. The comparison is marine ply vs commercial ply.

What we need from you

Who builds it is on About. Workshop: 208, Wakefield House, Ballard Pier, Fort, Mumbai, Maharashtra 400001. Phone and WhatsApp: +91 9987911330.

Call 9987911330 WhatsApp +91 9987911330

Book a free kitchen measure — call 9987911330 or WhatsApp +91 9987911330. You get an itemised quote and a timeline before any advance. Or send the form.

FAQ

With Mumbai Master Carpentry, often about 12–18 days after design approval and the advance, depending on size and finish. The first call, the site visit, and material sign-off come before that clock. You get confirmed dates before work starts.

After you approve the design and pay the advance. It does not start when you send the first WhatsApp. Fabrication is at our Fort workshop. Installation is booked around your society’s delivery window.

We aim for within 48 hours of enquiry on working days. The slot is confirmed when we book it. It is not a same-morning dash from Fort to Thane or Navi Mumbai in peak rain.

On most home jobs: 40% advance, 40% when the work reaches site, 20% at handover. The timeline is written before the advance. Large commercial jobs can differ, and that is on the quote.

A finish change after cutting, a site that is not ready (civil, plumbing, or stone), society access you tell us late, or appliance sizes that arrive after the carcass is cut. Each of those moves the dates we confirmed.

No. That range is a kitchen after approval. A carpentry renovation — kitchen, wardrobes, and the remaining joinery — is weeks. We confirm the sequence before we take the advance.

Request a free site visit

We aim to respond within 2 hours on working days. Final quote after measurement.

We never spam or share your number.

Enquiry received

Thank you. We'll call you back within 2 hours on working days.

Also message us on WhatsApp

Mumbai Master Carpentry · 208, Wakefield House, Ballard Pier, Fort, Mumbai, Maharashtra 400001 · +91 9987911330 · info@mumbaicarpentry.in